rbAmp
EN
Shop

STD energy meters

Import and export counted separately, and kept when your controller reboots

With solar on the roof, one total on the meter mixes what you bought with what you sold, and a counter kept in your controller starts over when it reboots. An STD meter counts import and export on the device itself and keeps the records, while the meter is powered — when the controller reboots, updates or disconnects.

Metering starts by itself at power-up; your controller sets the time and reads the data.

STD-U3I3 three-phase meter with three clamp sensors
Counters
Import and export, on the device
Interfaces
I²C or Modbus RTU, by a switch
Phases
One or three
Supply
5 V

01 / Keeps counting

The meter keeps counting. Your controller doesn’t have to.

The meter measures, integrates energy and keeps separate import and export counters — on its own, saved every second. Your controller reads the accumulated values whenever it is there. When it reboots, updates or loses the link, the counters on the meter lose nothing: read them again when it is back. A power cut under load loses about a second of energy at most.

Autonomy of metering is not autonomy of power: the meter must stay powered to keep counting.

Source: Docs › STD › Energy and periods

02 / Models

Choose your meter

STD-UI1 single-phase energy meter, top view: black DIN-clip enclosure, screw terminals N and L, one current input, a 7-pin connector and the Modbus/I²C switch, with its paired 60 A clamp sensor lying beside it

STD-UI1

Single-phase energy meter for DIN rail

One voltage and one current input; kit with a 60 A or 100 A clamp.

Clamp kit
View details
STD-U3I3 three-phase meter with three clamp sensors

STD-U3I3

Three-phase energy meter for DIN rail

Three voltage and three current inputs; kit with 60 A or 100 A clamps.

Clamp kit
View details

03 / Counters

Import and export are counted separately

A single net figure cannot tell you how much came from the grid and how much went to it. STD keeps two independent counters for active energy — import and export — and two for reactive. They only grow, so import and export never cancel each other. Interval energy is the difference of two readings; a missed boundary merges two intervals and loses nothing.

STD-U3I3: the direction follows the balance of the three phases — the standard meter convention: a site exporting on one phase while importing on another is counted correctly.

Source: Docs › STD › Measurement and energy

Illustration: a grid connection with an rbAmp STD-U3I3 meter. Energy taken from the grid and energy delivered to the grid are counted separately: grid import 1284.52 kWh, grid export 426.18 kWh. Illustrative values, not a live reading.
Import and export are kept as two counters that only grow. Illustrative values, not a live reading.

04 / Records

More than a counter: a record of your energy

Lifetime counters

Import and export, active and reactive; they never go down; journaled storage falls back to the last good copy.

Hourly history

The last 7 hourly records (energy and an electrical summary for each hour) survive a restart.

Snapshot banks

Eight independent banks: each consumer cuts its own period (a minute, 15 minutes, an hour) without disturbing the others.

Event log

Counter resets and adoptions, calibration saves and firmware updates, with before and after values.

  • On the meter: the counters, the last hours, the snapshots and the log — the source of truth.
  • On your master: the long archive, trends, tariffs and analytics — in rbgrid, Home Assistant or your own code.

The meter has no battery clock: your master sets the time after each restart. Counters run without it; hourly records are written once the time is set.

Source: Docs › STD › Energy and periods

05 / Resolution

High-resolution measurement, down to very small loads

Resolution

Current is published in microamperes and energy is counted in microwatt-hours. This is the step of the numbers, not an accuracy claim.

Start threshold

Below a starting current (400 µA by default, configurable) a channel adds no energy, so an idle circuit does not creep. Readings are not affected.

Accuracy

Measured on production modules: current error within ±0.2 % from 5 mA to 75 A with the 60 A kit and from 5 mA to 100 A with the 100 A kit; readings start at about 5 mA.

What this means: a standby load that a coarse reading would bury in noise shows as a steady value — small currents are smoothed over a few seconds for a stable reading — and the start threshold keeps the counter still at zero.

Source: Docs › STD › Reference › Measurement and energy

06 / Measured

Measured characteristics

Measured on one production module per kit (60 A and 100 A), each channel individually calibrated together with its sensor, against a reference meter on a resistive load. Current is given as the primary current with one pass of the wire through the sensor; on STD-U3I3 the figures cover all three channels.

STD-UI1

Parameter60 A kit100 A kit
Class±0.2 % in range 0.005 A – 75 A±0.2 % in range 0.005 A – 100 A
Upper end of the range75 A129 A
Voltage error±0.2 %±0.2 %
Power factor, resistive load0.999–1.0000.999–1.000
Reads from4.8 mA4.8 mA
Noise with no current0.2 mA0.35 mA

STD-U3I3

Parameter60 A kit100 A kit
Current error±0.2 % in range 0.005 A – 75 A±0.2 % in range 0.005 A – 100 A
Upper end of the range75 A129 A
Voltage error±0.2 %±0.2 %
Power factor, resistive load0.999–1.0000.999–1.000
Reads from4.8 mA4.8 mA
Noise with no current0.2 mA0.35 mA

Source: Docs › STD › Reference › Hardware

07 / Interfaces

One meter, two integration paths

I²C: for ESP32, Arduino, Raspberry Pi and your own electronics

The full register map, the same client libraries as BASIC (the library detects the module at start), a data-ready output, one bus for STD and BASIC together — change the default address of one of them first.

Modbus RTU: for inverters, PLCs, SCADA and your own Modbus master

The module has no RS-485 transceiver: the connector carries UART TTL and a driver-enable line for an external transceiver. The meter answers as a standalone Modbus device: a native integer map; a float32 register profile of 13 values (points outside the list read 0;

register map in the STD docs

); per-channel virtual unit ids on STD-U3I3. Switch position «Modbus default»: 9600 8N1, unit 1. Frames 8N1 / 8E1 / 8O1 / 8N2, from 2400 baud.

The interface is chosen with a three-position switch — Modbus RTU · Modbus default · I²C — read at power-up; move it and restart to change. Modbus needs no library: any Modbus master reads the meter.

Source: Docs › STD › Hardware · Reference › Modbus

08 / Three-phase

See all three phases at once

STD-U3I3 is not three single-phase meters on one board. All six channels are sampled synchronously in one measurement window: per-phase voltage, current, power and power factor come from the same instant, and the totals are built from them. Energy direction follows the phase balance.

Before you trust per-phase readings, the meter reports the phase angles and whether the sequence is forward, reverse or abnormal — a wiring check built in.

Source: Docs › STD › STD-U3I3

09 / Operation

Designed for continuous operation

Firmware update in the docs

Secure firmware updates with automatic recovery

Two firmware copies. The new image is written to the inactive copy over the working bus while metering continues. The image is signed and encrypted; a foreign, corrupted or older image is refused. A new image that does not confirm itself rolls back on its own.

Device identity and signed measurement records

Each meter carries a unique device certificate and answers a challenge from your master. Energy and log records are signed by the device, so records copied from another device or edited outside it are detected.

Counters that survive

Saved every second, journaled, restored from the last good copy. If the storage becomes unavailable the meter keeps metering and recovers when it returns.

Service

Status LEDs show metering and faults; an IDENTIFY command blinks them to find the meter in a cabinet.

10 / Safety

Designed for electrical panel installation

STD-UI1 and STD-U3I3 are galvanically isolated: the connector side (VIN, GND, bus) is isolated from the mains measurement inputs. The board comes in an enclosure that covers the lower part with all mains circuits; the upper part with the interface connector is open and isolated; only the voltage-sensor terminal comes out, in a plastic housing. The enclosure has a DIN clip and can be installed in a cabinet.

  • one 7-pin interface connector: power, ground, bus, data-ready, driver enable, reset
  • voltage input: a thin wire is enough (AWG26–22); a fuse in the L line is mandatory, rated up to 0.1 A
  • STD-U3I3: voltage terminal N, L1, L2, L3 — neutral required; fuse each L line
  • sensors: the kit comes pre-connected; each sensor stays on the channel it is labelled for; follow the arrow for the import direction

Safety. The measurement inputs connect to mains. For work inside an electrical panel, call a qualified electrician.

STD is a sub-metering and monitoring instrument. It is not a utility settlement meter and makes no certification claims.

Source: Docs › STD › Hardware

11 / Start

From power-on to energy metering

  1. 1 · Fit the sensors.

    Clamp each sensor on its conductor, arrow toward the load; keep it on the channel it is labelled for. No sensor calibration required.

  2. 2 · Set the switch, connect and power.

    Choose I²C or Modbus on the interface switch, connect the bus and power the meter. Metering starts by itself.

  3. 3 · Set the time from your controller.

    Once after each power-up — there is no battery clock. Counters run even without it.

  4. 4 · Read the data.

    Live values about ten times a second, the counters, the records and the events.

Metering runs independently. After this your controller can go away and come back; the meter keeps counting while it is powered.

Source: Docs › STD › Quick start

12 / Uses

What you can build

Home with solarImport and export as two counters in your dashboard. STD-UI1 on the input · I²C → ESP32.
Meter for an inverter or SCADAThe meter your Modbus master reads. STD over Modbus RTU with an external transceiver · Modbus.
Three-phase workshop or buildingPer-phase readings and totals. STD-U3I3 on the input · I²C or Modbus.
EV charging siteEnergy per charger. STD-U3I3 per charger · I²C or Modbus. Not a protective device.
Tenants on one meterEnergy per current channel from the meter's own map; on Modbus each channel can also answer as its own single-phase view (voltage, current, power). STD-U3I3 · I²C or Modbus.
Home Assistant nodeCounters and live values in Home Assistant. STD + ESP32 · ESPHome.

13 / System

BASIC + STD: one installation, many measurement roles

STD takes the points where the numbers must be right — the grid input, the inverter, the charger. BASIC adds the branches — boiler, heat pump, lighting, workshop. One bus, one library, one controller: STD is the source of truth, BASIC fills in the picture. Start with one STD; add BASIC when you want the branches.

Main grid input — STD → branches — BASIC → ESP32 / Raspberry Pi / PLC

Source: Configure this set

14 / Specifications

Technical specifications

Every line below is available.

Measurementsynchronous sampling, about 3 kHz per channel · windows of whole mains cycles, a complete snapshot about ten times a second · per channel: RMS voltage and current, active power (signed), reactive and apparent power, power factor (signed), frequency · phase angles and phase sequence (STD-U3I3) · current in µA, energy in µWh · start threshold 400 µA by default, configurable
Energy and recordsimport and export, active and reactive · lifetime counters, journaled, saved every second · hourly history, last 7 records, survives a restart · eight snapshot banks · event log with before/after values · time set by the master (no battery clock)
InterfacesI²C, 16-bit register map, address 0x50 by default · Modbus RTU from 2400 baud, 8N1 / 8E1 / 8O1 / 8N2, configurable word order · native register map · float32 register profile of 13 values · virtual unit ids (STD-U3I3) · discovery block · validated settings writes; reset, calibration and update need an explicit unlock · three-position interface switch, read at power-up · data-ready output · external RS-485 transceiver required (UART TTL + driver enable on the connector)
Update and identitytwo firmware copies · signed and encrypted image · automatic rollback · older images refused · update over the working bus while metering continues · device certificate · signed records
Hardware7-pin connector · VIN 4.5–5.5 V, 30 mA typical, 50 mA max · 3.3 V logic · I²C pull-up jumpers on the board · two status LEDs, IDENTIFY · enclosure with DIN clip · voltage input fuse up to 0.1 A in each L line
Kitcurrent sensor per channel, 60 A or 100 A, calibrated with its channel and labelled
Measured characteristicsSTD-UI1 and STD-U3I3 — above

Source: Docs › STD › Reference › Hardware

15 / Family

The STD family

Join the waitlist

STD-UI1 · STD-U3I3

Single-phase and three-phase meters.

RBgrid hub

A pre-flashed ESP32 and a shield with connectors for the modules.

One contract, one library: the channel count is discovered at run time.

16 / Developers

Libraries and documentation

Arduino · ESP-IDF · Python · ESPHome / Home Assistant — STD support: in validation until release. Modbus needs no library: any Modbus master reads the meter.

17 / Questions

Questions

Can STD be a utility settlement meter?

No. It is a sub-metering and monitoring instrument and makes no certification claims; it is not for utility settlement.

Does it need a controller?

Only to set the time and read the data. Metering starts by itself at power-up and keeps running while the meter is powered.

Do I need an RS-485 adapter?

For a Modbus network, yes: the meter carries UART TTL and a driver-enable line for an external transceiver.

What happens on power loss?

Energy is saved every second; a power cut under load loses about a second of energy at most. The counters continue from the last saved value.

Why set the time?

The meter has no battery clock. Counters run without it; hourly records need it.

Can I mix STD with BASIC?

Yes, on one I²C bus with one library. Both answer at the same default address, so change the address of one of them before connecting both.

Can I switch between I²C and Modbus later?

Yes. Move the interface switch and restart the meter; the switch is read at power-up.

60 A or 100 A?

The smallest rating above the circuit's maximum current. The sensors stay on the channels they are labelled for.

Is it accurate to a microampere?

No. A microampere is the resolution — the smallest step of the numbers, not the accuracy. Current is read from about 5 mA. On production modules the measured current error is within ±0.2 % from 5 mA to 75 A with the 60 A kit and to 100 A with the 100 A kit. Full figures for the 60 A and 100 A kits: Measured characteristics and the docs.

Ready to meter?

Pick single-phase or three-phase; the meter counts import and export on its own, and your controller reads the totals when it is there.